A site that can take unit trains up to 10,000 feet long changes how a plant or warehouse is laid out, because the track, not the street, becomes the front door. We build the industrial side of that equation at the Central New Mexico Rail Park in Los Lunas: rail-served buildings, transload pads, spur work, heavy truck courts and the utilities to run them, all on high-desert ground that drains in sheets and takes the wind from every direction.
The park is a 1,400-acre rail-served industrial park on NM 6 with access to I-25 and I-40, zoned SU-Rail Park 2 for industrial, manufacturing, fabrication, assembly, wholesale, distribution, storage and warehousing, with water, sewer, electric and gas services. That zoning list is broad, and it tells a developer or operator that most industrial uses are allowed in principle. The real planning begins when you ask which part of the park, which spur and which utility capacity fit your operation. We help you ask those questions early, through rail spur site improvements planning and a clear budget.
We know how a rail-park job differs from a city lot: the lead times are longer, the equipment is bigger, and the people who care about the schedule include railroad operations staff as well as your own.
The park is about 3 miles from BNSF's transcontinental line, is served by BNSF, and offers transload, car storage and industry spurs. Next door, the 500-acre Los Morros Business Park is listed with tenants that include a regional retail distribution center, a specialty materials maker, a medical equipment company and a bottler. A presentation to a legislative committee on October 15, 2024 listed a 750-acre, 4.2-million-square-foot data center campus nearby, more than 50 active projects, an I-25 interchange in 2025 and a newly announced hospital site.
Taken together, those facts describe a place where heavy industry, distribution and large single-user campuses share roads and utilities. For a tenant, that means competition for power, water and skilled trades, and for us it means lining up crews and long-lead materials early. The neighboring Huning Business and Tech Park is a marketed site of about 716 acres next door, and we compare both when owners ask where to start.
Our scope in the park covers the full range of industrial work. We build tilt-wall and steel buildings with dock doors on the truck side and rail doors on the track side, concrete transload pads for bulk and containerized goods, and heavy-duty paving for truck courts. A rail-served building needs a floor slab that can carry forklift loads at the track door and a roof that can drain in the many directions a long building needs.
We also deal with the site elements people forget: grade crossings, signal clearances, car-spotting lengths and the slope of a spur that must be nearly level. The work is carried out in coordination with the railroad, which approves the track design and often supplies the crews for any physical connection. A tilt-wall building is a common choice for the main structure because the panels go up quickly and the walls are tough enough for a plant that moves heavy goods.
We schedule and supervise the earthwork, underground utilities, concrete and a share of the site paving. On a site of this scale, mass grading is a production operation: scrapers, compactors and water trucks working in a pattern that keeps the pad level and the moisture right. Testing runs alongside, so the geotechnical engineer can release each lift before the next is placed.
Underground work is next: sewer and water mains, a fire loop and the electrical duct banks that bring service from the utility to the building. We install concrete-encased banks with spacers and verified separation so the conduit meets the utility's inspection the first time. Because the park supplies water, sewer, electric and gas, the utility connection design is part of every project we start.
Bulk-material processors, metal fabricators, building-products makers, food and beverage producers and logistics and distribution operators are the natural fit for the zoning list, and large single-user campuses such as the data center next door. A Village of Los Lunas presentation described over 50 active projects, which suggests that the park's neighbors will keep growing.
A single operator rarely needs everything in the park. We help a tenant decide which pieces to build first, such as a transload pad now and a processing building later, and we keep the site plan open so the next phase can connect without demolition. Users with high power demand should also read our page for data centers, which covers the electrical and cooling side of the work.
A rail project has more schedule dependencies than a normal industrial build. Track design approvals, material orders for rails and ties, and railroad work windows can control the critical path. We list these dates at the start, assign an owner to each one and track them weekly. Concrete work moves in parallel, and we put the tilt-wall slab and panels on a schedule that allows for wind delays.
Roads are changing, too. I-25 exit 203 serves NM 6 to Los Lunas, and exit 201 (Los Lunas Boulevard, currently Morris Road) is under construction with an expected 2029 opening. We plan haul routes around the open exit and keep a backup if closures change. For big equipment orders, our long-lead procurement management puts switchgear, steel and rail materials on order before the permit is final.
The largest line items are usually earthwork volume, spur construction, utility extensions and the foundation system for heavy process equipment. Unlike a building on a city lot, the cost of getting service to the site can equal the cost of the building. We price those pieces separately so the owner can compare sites on total cost.
Rail adds its own costs: railroad review fees, flagging during construction and the materials for the track. We estimate them with the railroad's requirements in hand. When an owner has a choice between building trackside or farther from the tracks, we compare the cost of a longer spur with the cost of a longer truck haul and present both.
Give us the cargo, the track length and the building you need. We will review the park's layout and utilities and return a budget and schedule that include the railroad's part. See also our broader work around Los Lunas.
The brochure lists industrial, manufacturing, fabrication, assembly, wholesale, distribution, storage and warehousing. Specific uses, such as those with hazardous materials or heavy emissions, still need review. We confirm the use with the village before design.
The park can accommodate unit trains up to 10,000 feet, but your parcel's usable length depends on its shape and on the grades. We lay out the spur early so the building does not block the best track alignment.
The railroad reviews and often performs the work on its own right of way. We build the spur on your property and coordinate every step with the railroad's engineers and schedulers.
Wind affects panel lifting, bracing and roof placement more than the finished building. We schedule lifts in the early morning when winds are lower and brace panels for the full load until the roof diaphragm is complete.
A village presentation listed over 50 active projects, so we assume competition for skilled trades. We secure trade partners early and plan the underground and concrete scopes around their availability.
Tell us about the property, the building and the schedule.