Buying raw acreage is one decision, and turning it into a building site with roads, water, drainage and a pad is another, and the second one is where we spend our time. At the Huning Business and Tech Park in Los Lunas, a marketed site of about 716 acres in the northwest quadrant of I-25 and Highway 6, we help owners and developers cut a large parcel into usable lots, then build on them in the order that makes financial sense.
The pitch of the land is simple: zoned M-1/Commercial by the Village of Los Lunas, with all utilities available and water and sewer provided by the village. The questions that follow are practical. Which part of the acreage drains toward which arroyo? Where does the first road go? How much fire flow does the first tenant need and what does the village main supply? We use industrial design-build delivery on sites like this so the civil design, the building design and the budget are developed together.
The land is open mesa and river terrace, so wind, dust and sudden storm flow shape the work from the first day of grading. We keep a water truck on the job, protect disturbed slopes and size basins for the full build-out rather than only the first phase.
We start with a master site plan, even if the owner only plans to build one building. That plan shows the roads, utility corridors, drainage paths and lot lines for the entire parcel, so the first building does not block the second. Then we price phase one: the main access road, the first utility extensions, a detention basin and the pad itself. Each later phase repeats that cycle.
This approach protects an owner from the most common mistake on a large industrial parcel, which is building a road or a pipe in the wrong place. Moving a water main after the fact can cost more than the building it serves. We also coordinate with the village so the utilities we install meet its standards for later acceptance.
Grading windows matter on open land. We aim to finish the bulk earthwork and place erosion controls before the monsoon season, since a bare slope loses topsoil fast in a single storm and sediment in the channel can lead to a stop-work notice. When schedule forces work through the wet season, we stage the basins first so runoff has somewhere to go.
The broker listing places the park near BNSF Railway and next to the Central New Mexico Rail Park (listed as under construction), the PNM Solar Project, the Huning Ranch master planned community and a retail distribution center. It also puts the park about 15 minutes south of the Albuquerque Sunport and 25 minutes south of the I-25/I-40 interchange, with access from Interstate 25 and Highway 6. We treat a listing as a claim to verify, so we confirm distances and adjacencies on the ground before an owner relies on them.
Even so, the picture is clear enough to guide design. A rail park next door suggests heavier industrial neighbors, and a solar project suggests open land and electrical infrastructure nearby. A housing community suggests workers and traffic. For users who want to understand the airport side of that drive, the Sunport area is the other end of the corridor, and the Central New Mexico Rail Park is the closest comparison on rail service.
M-1/Commercial zoning, assigned by the Village of Los Lunas, permits a wide range of industrial and commercial uses, but each use still goes through site plan review. The village provides water and sewer, so utility applications run through the same office as the building permit. For the building itself, the 2021 New Mexico Commercial Building Code applies, adopting the 2021 International Building Code as amended, and the 2020 New Mexico Electrical Code governs the power systems.
A building over a certain size or hazard class will need fire-flow calculations and a hydrant layout reviewed by the fire marshal. Our team designs the fire water loop and hydrant system in step with the building so the review is a confirmation, not a surprise.
Owners on acreage this size often need more than a building. The site utilities package covers water, sewer, fire line, conduit and gas, delivered as one scope with one schedule. They also ask for truck courts, parking, lighting and security fencing, which we bundle with the building to reduce the number of contractors on the ground.
Common building types include distribution centers, light manufacturing shells and small-bay buildings for trades. Because the parcel is near a solar project, users in utilities and power sometimes ask about substations, equipment pads and laydown yards, and we scope those with the same civil team.
On a raw parcel, the first million dollars often goes into things you cannot see after the job is done: roads, pipe, conduit, grading and drainage. We separate those costs from the building cost so a lender or investor can see them clearly and can compare sites on a fair basis.
Three drivers deserve extra attention. Earthwork volume depends on how much cut and fill the master plan needs. Utility distances depend on where the village main sits relative to the first lot. Drainage depends on how the parcel's natural channels are treated. We show each as a range with a clear trigger, so a change in the plan does not become a surprise in the contract. Occupants in Los Lunas will also want to know whether the village's fee schedule applies.
Tell us the acreage, the use and the timeline. We will review the zoning and utilities and return a phased plan with a budget you can show a lender.
Yes. We prepare a master plan for the whole parcel first, then build only the pieces you need. That keeps roads, pipes and basins in the right place so later phases connect without rework.
That depends on the village's rules and on any agreement you negotiate. We price the physical work and help you ask the village the right questions about cost sharing and fees.
As a starting point. We check drive times, access ramps and neighboring uses directly before they shape a design or a lease.
Open land usually has natural channels that carry rain from the higher ground. We map them with the surveyor, avoid building across them and size basins to hold the additional runoff from new pavement and roofs.
We can, and we help owners decide whether it makes sense. A spec building costs money to carry, so we recommend a flexible shell that fits several uses and a design that can be divided into bays.